Search for media from: "Luca Alexe"

Cobas® 5800 System - Unpacking the Instrument

Cobas® 5800 System - Unpacking the Instrument

From  Luca Alexe 9 likes 588 plays 0  

Performing a run

This procedure describes the steps to perform a run on the instrument.

From  Luca Alexe 2 likes 207 plays 0  

Collection Medium Container Carrier Loading Check

This check is verifying that the cobas® 5800 instrument is locking, unlocking and detecting medium container carriers correctly.

From  Luca Alexe 1 likes 4 plays 0  

Instrument Interlock Check

Instrument Interlock Check This check is testing the interlock on the cobas® 5800.

From  Luca Alexe 0 likes 122 plays 0  

Sample Loading Camera Calibration

This check is assisting the service engineer to calibrate the camera of the cobas® 5800 instrument.

From  Luca Alexe 0 likes 162 plays 0  

Cobas® 5800 System - Leveling the Instrument

This procedure is to show how to raise and level the instruments.

From  Luca Alexe 1 likes 264 plays 0  

Process Transfer Head Tightness Check

This check is checking the tightness of the process transfer head on the cobas® 5800 instrument.

From  Luca Alexe 1 likes 26 plays 0  

Instrument initialization

This procedure describes the initialization of the instrument.

From  Luca Alexe 1 likes 95 plays 0  

Instrument preparation

This procedure describes the steps to prepare the instrument before performing a run.

From  Luca Alexe 0 likes 84 plays 0  

Cobas® 5800 System - Setting up the Instrument

This procedure describes the steps to set up the instrument after a complete hardware installation.

From  Luca Alexe 1 likes 376 plays 0  

Liquid Waste Station Check

This check is checking the correct fluid connection from the Liquid waste station to the Liquid waste container and from the Liquid waste station to the Overflow bottle of the cobas® 5800…

From  Luca Alexe 0 likes 8 plays 0  

Lysis Tubing Check

This check verifies the correct fluidic connection from:•Lysis reagent container 1 to Liquid waste 1 •Lysis reagent container 2 to Reagent pipetter (R2/R3) then further from Wash station to…

From  Luca Alexe 0 likes 45 plays 0  

Sealer 24 Check

This check is checking the sealer is correctly sealing an AD-Plate on the cobas® 5800 instrument.

From  Luca Alexe 0 likes 5 plays 0  

Liquid Waste 2 Tare Check

The calibration/taring of the weight sensor is done with an empty weight sensor in production. The SSW Check, in contrast, is done after the reservoir is placed and the tubing are attached, hence…

From  Luca Alexe 0 likes 4 plays 0  

Liquid Waste 1 Tare Check

The calibration/taring of the weight sensor is done with an empty weight sensor in production. The SSW Check, in contrast, is done after the reservoir is placed and the tubing are attached, hence…

From  Luca Alexe 0 likes 20 plays 0  

Instrument Dry Check

This check dries the fluidic system of the cobas® 5800 instrument with air in order to prepare it for storage or transportation.

From  Luca Alexe 0 likes 133 plays 0