Search for tag: "5800"

Premiera nowego systemu cobas® 5800 w Polsce

Premiera nowego systemu do diagnostyki molekularnej cobas® 5800 w Polsce.

From  Piotr Laptas 0 likes 73 plays 0  

ECP System Manager - Field bus check

The check is used to detect field bus anomalies

From  Pauline Untereiner 0 likes 22 plays 0  

Analytic Cycler Optical Check

This check is testing the optical unit of the cobas® 5800.

From  Pauline Untereiner 0 likes 40 plays 0  

Balance Calibration Check

This check is calibrating the balance on the cobas® 5800 instrument.

From  Pauline Untereiner 0 likes 65 plays 0  

Reagent Head Pipetting Check Pipettor 2

This check performs pipetting with reagent transfer head 2 on the cobas® 5800 instrument.

From  Pauline Untereiner 0 likes 12 plays 0  

Reagent Head Pipetting Check Pipettor 1

This check performs pipetting with reagent transfer head 1 on the cobas® 5800 instrument.

From  Pauline Untereiner 1 likes 24 plays 0  

Reagent Pump Calibration Check Pipettor 2

This check is calibrating the pump of reagent transfer head 2 on the cobas® 5800 instrument.

From  Pauline Untereiner 0 likes 7 plays 0  

Reagent Pump Calibration Check Pipettor 1

This check is calibrating the pump of reagent transfer head 1 on the cobas® 5800 instrument.

From  Pauline Untereiner 1 likes 33 plays 0  

Instrument initialization

This procedure describes the initialization of the instrument.

From  Luca Alexe 1 likes 61 plays 0  

Instrument preparation

This procedure describes the steps to prepare the instrument before performing a run.

From  Luca Alexe 0 likes 48 plays 0  

Performing a run

This procedure describes the steps to perform a run on the instrument.

From  Luca Alexe 1 likes 150 plays 0  

Cobas® 5800 System - Setting up the Instrument

This procedure describes the steps to set up the instrument after a complete hardware installation.

From  Luca Alexe 1 likes 275 plays 0  

Cobas® 5800 System - Leveling the Instrument

This procedure is to show how to raise and level the instruments.

From  Luca Alexe 1 likes 163 plays 0  

Liquid Waste Station Check

This check is checking the correct fluid connection from the Liquid waste station to the Liquid waste container and from the Liquid waste station to the Overflow bottle of the cobas® 5800…

From  Luca Alexe 0 likes 8 plays 0  

Lysis Tubing Check

This check verifies the correct fluidic connection from:•Lysis reagent container 1 to Liquid waste 1 •Lysis reagent container 2 to Reagent pipetter (R2/R3) then further from Wash station to…

From  Luca Alexe 0 likes 30 plays 0  

Sealer 24 Check

This check is checking the sealer is correctly sealing an AD-Plate on the cobas® 5800 instrument.

From  Luca Alexe 0 likes 5 plays 0